Technical Event

Bridge Making

PUT YOUR ENGINEERING INSTINCTS TO THE TEST IN THE BRIDGE MAKING EVENT, WHERE CREATIVITY MEETS STRUCTURAL STRENGTH. DESIGN AND BUILD A BRIDGE THAT STANDS TALL UNDER PRESSURE AND PROVES YOUR TEAM'S INGENUITY!

Fri Apr 24 2026
11:00 AM - 5 :00 PM
A - 403 - 4th Floor
CREDITS: ₹300
Bridge Making

Operational Protocols

01

Length of the bridge must be minimum 350mm.

02

The overall width of bridge must be minimum 100mm.

03

Model must include truss.

04

A concentrated load will be applied on the bridge in the centre.

05

The bridge design will be supported in between the 2 ends of the table.

06

There can only 2 participants in a team.

07

Fevicol, 100 Popsicle Sticks and thread will be provided.

08

The duration will be 2hrs for building the bridge, and 3hrs for drying period.

Command & Control

Field Operatives (Students)

Mr. Deekshith Kotian

Ms. Ankitha

Mr. Nelappa Madar

Commanding Officers (Faculty)

Dr. Saketh Shetty (CV)

Mr. Sleeba Mathew C (AIDS)

Mr. Sleeba Mathew C (AIDS)